No Drilling Required BT482P-CHR Guida di Installazione

Navigare online o scaricare Guida di Installazione per no No Drilling Required BT482P-CHR. No Drilling Required BT482P-CHR Installation Guide Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 1
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
Shower Bar Installation
Step 1: Remove chrome cover cap from
each of the two chrome posts and carefully
loosen dual set screws
Step 2: Slide the adjustable holder onto
middle of the bar by squeezing the button.
Slide ends pieces onto bar and lightly
tighten dual set screws
Step 3: Position in shower to optimum
height and adjust chrome post to desired
position. Tighten dual set screws until firm
(do not over tighten)
Step 4: Clean surface with alcohol pad and
let dry completely. Attach adapter to each
end post and peel and set in position.
Unscrew adapter and remove bar.
Step 5: Pierce adhesive tube with red key
and inject into one hole until it beads up
the opposite check hole. Let stand
undisturbed for 12 hours.
Step 6: Assemble bar to adapter and attach
the hand shower
Vedere la pagina 0
1

Sommario

Pagina 1 - Shower Bar Installation

Shower Bar InstallationStep 1: Remove chrome cover cap from each of the two chrome posts and carefully loosen dual set screws Step 2: Slide the adjust

Commenti su questo manuale

Nessun commento